Building construction project in Uganda showing a multi-storey building under construction with professional supervision and construction workers.

Building Construction Regulations and Requirements in Uganda: A Complete Guide for Property Owners and Developers

Building a house, apartment, office, warehouse or commercial property in Uganda involves more than purchasing land and hiring construction workers. Every building project must follow applicable planning laws, building regulations, approved construction standards and safety requirements.

Understanding building construction regulations in Uganda before starting work can help you avoid legal penalties, unnecessary expenses, construction delays and problems when obtaining an occupation permit. Whether you are planning a residential home in Kampala, a commercial building in Wakiso, rental apartments in Mukono or a development in another district, it is important to understand the approvals and professional requirements that apply to your project.

Uganda’s building regulatory framework includes the Building Control Act, Cap. 136, the Building Control Regulations, 2020, the National Building Code, 2019 and the Building Control (Amendment) Act, 2026. These laws establish requirements for building permits, professional involvement, construction standards, inspections and the safe use of completed buildings.

This guide explains the main building construction regulations and requirements in Uganda, the documents you may need, the approval process, the responsibilities of property owners and the importance of working with qualified construction professionals.

1. What Are Building Construction Regulations in Uganda?

Building construction regulations are laws, standards and procedures governing how buildings are planned, designed, approved, constructed, inspected and occupied.

Their main purpose is to ensure that buildings are:

  • Structurally safe and stable.
  • Designed and constructed according to approved plans.
  • Suitable for their intended use.
  • Properly ventilated and adequately lit.
  • Provided with appropriate sanitation and drainage.
  • Accessible and safe for occupants, where applicable.
  • Constructed using suitable materials and accepted workmanship.
  • Developed in accordance with approved land-use and planning requirements.

These requirements apply to different types of building operations, including new construction, structural alterations, extensions, renovations and other regulated works.

A property owner should not assume that a project is exempt from approval simply because it is small or privately funded. The applicable requirements depend on the nature, size, location and classification of the proposed development.

2. Main Laws and Authorities Governing Building Construction in Uganda

Several laws and public institutions are involved in regulating construction activities in Uganda.

The Building Control Act, Cap. 136

The Building Control Act, 2013 provides the main legal framework for controlling building operations in Uganda. It establishes the National Building Review Board (NBRB) and Building Committees responsible for building regulation and enforcement.

The Act addresses:

  • Building permit applications.
  • Building plan approval.
  • Responsibilities of property owners and construction professionals.
  • Building inspections and enforcement.
  • Requirements for occupation permits.
  • Actions against unsafe or unauthorised construction.

The original Act has since been amended, so developers should consult the current consolidated legal position rather than relying on older summaries alone.

The Building Control (Amendment) Act, 2026

The Building Control (Amendment) Act, 2026 commenced on 19 March 2026 and introduced changes intended to strengthen enforcement, improve accountability and increase compliance with building safety requirements.

Among the important changes are:

  • Expanded powers of the National Building Review Board.
  • Changes to the composition and powers of Building Committees.
  • Stronger enforcement against unauthorised construction.
  • Increased penalties for certain building-related offences.
  • Additional provisions concerning building permits and their validity.
  • Greater attention to the approval of unconventional construction methods, materials and technologies.

The amendment also strengthens the consequences of building without a valid permit. The NBRB has explained that the revised penalty can include a fine calculated according to the built-up area or imprisonment, or both, as provided by the amended law.

Property owners should therefore obtain the required approvals before construction begins and ensure that permits remain valid throughout the project.

The Building Control Regulations, 2020

The Building Control Regulations, 2020 provide more detailed procedures for implementing the Building Control Act.

They address matters such as:

  • Applications for building permits.
  • Design and supervision by qualified professionals.
  • Construction documentation.
  • Building inspections.
  • Responsibilities during construction.
  • Completion certification and occupation requirements.

The National Building Code, 2019

The National Building Code, 2019 establishes technical requirements for safe and suitable building construction.

It covers important areas such as structural design, fire safety, sanitation, ventilation, accessibility, building materials, drainage and general building performance.

The Physical Planning Act, 2010

The Physical Planning Act provides the framework for land-use planning and development control.

A building project must be compatible with applicable planning requirements, including approved land use, zoning, development plans, road reserves and other planning restrictions.

Important: These laws work together. Obtaining a building permit does not mean that a developer can ignore planning conditions, approved drawings, construction standards or other applicable legal requirements.

3. Which Authorities Regulate Building Construction in Uganda?

Understanding which authority handles your application is an important part of complying with building construction regulations.

National Building Review Board (NBRB)

The National Building Review Board provides national oversight of building control in Uganda.

Its responsibilities include:

  • Monitoring the implementation of building regulations.
  • Guiding and overseeing Building Committees.
  • Promoting compliance with building standards.
  • Handling complaints within its legal mandate.
  • Supporting enforcement of building control requirements.
  • Promoting safer construction practices.

The NBRB is an important source of information for property owners, developers, contractors and construction professionals.

District and Urban Authority Building Committees

Building Committees operate through local government and urban authorities. They are responsible for handling building control functions within their respective areas.

Depending on the location, the relevant Building Committee may:

  • Receive building permit applications.
  • Review submitted plans and supporting documents.
  • Assess compliance with building requirements.
  • Issue building permits.
  • Arrange or conduct building inspections.
  • Address unauthorised or unsafe construction.
  • Consider applications for occupation permits.

Property owners should identify the correct Building Committee before submitting an application.

Kampala Capital City Authority (KCCA)

For construction projects within Kampala, KCCA handles applicable development permission and building plan approval processes.

The authority assesses submitted applications against relevant planning and building requirements. Depending on the project, applicants may need to provide land ownership documents, architectural drawings, structural drawings, surveying information and other technical documents.

Applications should be submitted through the applicable KCCA process, including its Smart Permit system where required.

Developers outside Kampala should contact the relevant district, municipality, city or urban authority to establish the applicable procedure.

4. Requirements Before Starting Building Construction in Uganda

Before construction begins, a property owner should complete several important steps.

4.1 Verify Land Ownership and Property Boundaries

The first step is to establish that the land is legally available for the intended development.

Important checks include:

  • Confirming the land title or other acceptable ownership documentation.
  • Conducting an appropriate land search.
  • Confirming the location and boundaries of the property.
  • Checking for disputes, encumbrances or competing claims.
  • Establishing whether the land is affected by a road reserve or other planning restriction.
  • Confirming whether the intended development is compatible with the applicable land-use requirements.

A registered surveyor can help establish the property’s boundaries and prepare the relevant surveying information.

Building on disputed land or outside approved property boundaries can result in serious legal and financial problems.

4.2 Conduct a Site Assessment

A site assessment helps determine whether the land is suitable for the proposed building.

Depending on the project, the assessment may consider:

  • Soil conditions and bearing capacity.
  • Site levels and ground slope.
  • Existing drainage patterns.
  • Access roads and site accessibility.
  • Flooding and waterlogging risks.
  • Nearby buildings and infrastructure.
  • Availability of water, electricity and other utilities.

For projects requiring detailed ground investigation, an appropriate geotechnical assessment may be necessary.

The results help the design team determine suitable foundations, drainage arrangements and other construction requirements.

4.3 Engage Qualified Building Professionals

Building projects should involve appropriately qualified and registered professionals for the work they are authorised to undertake.

Depending on the building and its complexity, these may include:

  • Architect: Prepares architectural designs and building drawings.
  • Structural engineer: Designs and assesses structural elements such as foundations, columns, beams, slabs and roof structures.
  • Quantity surveyor: Prepares cost estimates, bills of quantities and construction cost assessments.
  • Land surveyor: Helps establish boundaries, levels and setting-out information.
  • Physical planner: Advises on planning requirements and land-use considerations.
  • Electrical engineer or qualified electrical professional: Handles relevant electrical design and installations.
  • Mechanical and plumbing professionals: Assist with building services and related installations.

The required professional appointments depend on the building category and applicable regulations.

For certain multi-storey buildings, the 2026 amendment introduces specific structural-engineering documentation requirements. The Act defines a multi-storey building for this provision as one exceeding 12 metres in height.

Always confirm the exact professional and documentation requirements applicable to your project with the relevant Building Committee.

5. Documents Required for Building Plan Approval in Uganda

One of the most important building construction requirements in Uganda is submitting the correct documents to the relevant authority.

Although the exact checklist varies depending on the project and location, commonly required documents may include:

DocumentPurpose
Land title or proof of ownershipEstablishes the applicant’s legal interest in the land
Land search documentsHelp verify the property’s ownership status
Survey reportConfirms boundaries, location and relevant site information
Architectural drawingsShow the proposed building layout, elevations and design
Structural drawingsShow the proposed structural design and details
Structural calculationsSupport the safety and adequacy of the structural design where required
Application formsProvide the information required by the approving authority
Professional registration detailsDemonstrate the involvement of appropriately qualified professionals
Site and planning informationHelps assess the suitability of the proposed development
Payment receiptsConfirm payment of applicable application and inspection fees

Additional documents may be required depending on the building’s size, location, intended use and complexity.

For example, a large commercial development may require more technical documentation than a simple residential project.

Architectural Drawings

Architectural drawings explain how the building will look and function.

They may include:

  • Site plans.
  • Floor plans.
  • Elevations.
  • Sections.
  • Roof plans.
  • Door and window schedules.
  • Relevant design details.

The drawings should reflect the intended use of the building and comply with applicable planning and building requirements.

Structural Drawings

Structural drawings show how the building will safely carry its expected loads.

They may include:

  • Foundation layouts.
  • Column and beam details.
  • Reinforcement details.
  • Suspended slab designs.
  • Staircase structural details.
  • Roof structural information.
  • Relevant engineering calculations.

Structural designs should be prepared and certified by appropriately qualified professionals.

6. Building Permit Requirements in Uganda

A building permit is one of the most important legal requirements before undertaking regulated building operations.

Under the Building Control Act, a person should not carry out a regulated building operation without a valid building permit issued by the relevant Building Committee.

The permit confirms that the proposed work has undergone the required approval process and is authorised subject to the approved plans and conditions.

When Is a Building Permit Required?

A permit may be required for activities such as:

  • Constructing a new residential house.
  • Building apartments or rental units.
  • Constructing commercial buildings.
  • Developing warehouses and industrial structures.
  • Carrying out structural alterations.
  • Extending an existing building.
  • Undertaking other regulated building operations.

Some minor works may be treated differently under the law. However, property owners should not decide independently that their project is exempt.

Contact the relevant Building Committee to confirm whether your proposed work requires a permit.

How to Apply for a Building Permit in Uganda

The general process involves the following steps:

Step 1: Identify the Relevant Building Committee

Determine which authority is responsible for the property location.

Step 2: Engage the Required Professionals

Appoint the relevant architect, engineers, surveyors and other professionals according to the nature of the development.

Step 3: Prepare Building Plans

Have the architectural and engineering documents prepared in accordance with applicable standards and project requirements.

Step 4: Assemble Supporting Documents

Collect land ownership documents, survey information, application forms, professional details and other required supporting documents.

Step 5: Submit the Application

Submit the application through the relevant authority’s approved application procedure.

For Kampala, applicants should follow the applicable KCCA development permission and building plan approval process.

Step 6: Pay Applicable Fees

Pay the required application, assessment and other applicable charges.

Step 7: Respond to Technical Queries

The authority may request additional information, corrections or revised drawings before making a decision.

Step 8: Obtain Approval

Do not begin regulated construction work until the required permit has been issued and its conditions understood.

7. Building Construction Standards and Technical Requirements

Obtaining a building permit is only one part of compliance. The actual construction work must also follow approved drawings and applicable technical standards.

7.1 Foundation and Structural Safety

Foundations must be suitable for the soil conditions, building loads and design requirements.

Important considerations include:

  • Appropriate foundation design.
  • Correct excavation dimensions.
  • Suitable foundation materials.
  • Proper reinforcement where specified.
  • Adequate concrete quality.
  • Correct construction of columns and beams.
  • Proper supervision and inspection.

Poor foundation work can cause settlement, cracking and structural instability.

7.2 Quality of Building Materials

Construction materials should be suitable for their intended purpose and meet applicable standards.

Examples include:

  • Cement.
  • Sand.
  • Aggregates.
  • Reinforcement steel.
  • Concrete blocks and bricks.
  • Roofing materials.
  • Timber.
  • Plumbing products.
  • Electrical materials.
  • Finishing materials.

Materials should be selected according to the design specifications and relevant quality requirements.

Using substandard or unsuitable materials can compromise building safety and durability.

7.3 Fire Safety Requirements

Buildings should incorporate fire safety measures appropriate to their size, use and occupancy.

Depending on the project, these may include:

  • Suitable escape routes.
  • Emergency exits.
  • Fire detection systems.
  • Fire extinguishers.
  • Fire-resistant construction elements.
  • Emergency lighting.
  • Fire access provisions.
  • Appropriate fire protection installations.

Commercial buildings, public buildings and larger developments may have more extensive fire safety requirements.

The design team should confirm the applicable requirements with the relevant authorities.

7.4 Ventilation and Natural Lighting

Buildings should provide suitable ventilation and lighting for their intended use.

Design considerations may include:

  • Adequate window openings.
  • Natural ventilation.
  • Artificial ventilation where necessary.
  • Sufficient daylight.
  • Appropriate room layouts.
  • Safe indoor environmental conditions.

These provisions help create comfortable and functional living and working spaces.

7.5 Drainage and Sanitation

Proper drainage and sanitation are essential for protecting buildings and their occupants.

Construction plans should address:

  • Surface water drainage.
  • Roof water collection and disposal.
  • Wastewater management.
  • Appropriate sanitary facilities.
  • Connection to available public services where applicable.
  • Suitable on-site sanitation where approved.
  • Prevention of waterlogging and uncontrolled runoff.

Poor drainage can damage foundations, weaken access roads and create unhealthy conditions around a building.

7.6 Accessibility Requirements

Buildings should incorporate applicable accessibility provisions so that people with disabilities and other users can access and use relevant spaces safely.

Depending on the building’s use, these may include:

  • Accessible entrances.
  • Suitable ramps.
  • Appropriate door widths.
  • Accessible circulation routes.
  • Handrails.
  • Accessible sanitary facilities.
  • Suitable lifts in relevant multi-storey developments.

The design should address the accessibility requirements applicable to the building category.

8. Building Inspections During Construction

Building inspections help confirm whether construction work follows the approved plans, applicable regulations and required standards.

A Building Control Officer or authorised representative may inspect a construction site as provided by the law and regulations.

Inspections may occur at different stages, including:

Site Preparation and Foundation Stage

The relevant inspection may assess site preparation, setting out, excavation and foundation work.

Structural Construction Stage

Inspections may consider structural elements such as reinforcement, columns, beams, slabs and other important components.

Roofing and Building Services Stage

Depending on the project, checks may cover roofing, electrical installations, plumbing, drainage and other building services.

Completion Stage

The completed building may be examined to determine whether it conforms to approved plans and applicable requirements.

Property owners and contractors should cooperate with lawful inspection procedures and maintain relevant site records.

Important: Do not cover up structural or other work that requires inspection before the relevant inspection has been completed. Follow the inspection instructions issued for your project.

9. Requirements for Changing Approved Building Plans

Sometimes a property owner may want to change the original design during construction.

Examples include:

  • Adding another floor.
  • Changing room layouts.
  • Extending the building.
  • Altering structural elements.
  • Changing the roof design.
  • Converting residential space into commercial space.
  • Modifying drainage or other building services.

However, changes to approved plans should not be made without first establishing whether revised approval is required.

Structural alterations can affect the safety of the entire building. Any proposed structural change should be assessed by the relevant qualified professional.

Where necessary, revised drawings and supporting documents should be submitted to the Building Committee for approval before the affected work proceeds.

10. Building Permit Validity and Construction Timelines

A building permit is not permission to leave a project inactive indefinitely.

Under the Building Control framework, general permit commencement and completion periods are subject to statutory requirements.

The general provisions require construction to commence within 12 months and completion within 60 months from commencement, subject to the applicable law and any valid extension.

The 2026 amendment also changed certain procedures relating to extensions. An application for extension must be made at least 30 days before the permit expires.

These statutory periods should not be confused with recommended construction schedules. A typical house may take considerably less time to complete, depending on its size, design, financing, weather, labour and material availability.

Developers should check the conditions and expiry date on their actual permit and apply for any necessary extension within the required period.

11. Occupation Permit Requirements in Uganda

Completing construction does not automatically mean that a building can be occupied or used.

Under the Building Control Act, the owner is required to notify the relevant Building Committee of practical completion and apply for an occupation permit.

The authority may examine the completed building to establish whether it has been constructed in accordance with the approved plans and applicable requirements.

An occupation permit may be issued where the authority is satisfied that the building complies with the relevant requirements.

The inspection may consider matters such as:

  • General building safety.
  • Compliance with approved plans.
  • Structural completion.
  • Relevant fire safety provisions.
  • Sanitation and drainage.
  • Accessibility requirements.
  • Other applicable building standards.

The Act provides for the Building Committee to examine the building within 14 days after receiving the required completion notification and occupation permit application.

The law also provides for certain partially completed buildings to receive a limited occupation permit where the Building Committee determines that the building is safe and adequate for human habitation. This is not automatic and should not be assumed to apply to every unfinished building.

Property owners should obtain the required occupation approval before using or occupying a building, except where the law provides otherwise.

12. What Happens If You Construct a Building Without Approval in Uganda?

Constructing without the required permit or ignoring approved building requirements can create serious consequences.

Possible consequences include:

  • Financial penalties.
  • Stop-work or enforcement notices.
  • Delays in completing the project.
  • Orders to correct non-compliant construction.
  • Difficulty obtaining an occupation permit.
  • Orders affecting the use or safety of the building.
  • Demolition in circumstances authorised by law.
  • Legal liability where non-compliance causes harm.

The Building Control (Amendment) Act, 2026 strengthened enforcement powers and increased penalties for certain offences.

The NBRB has highlighted that constructing without a permit can attract a penalty calculated at two currency points per square metre of built-up area or imprisonment of up to five years, or both, under the amended provisions.

The precise legal consequences depend on the offence and the applicable provisions. Property owners should consult the current law and the relevant authority rather than relying on informal advice.

The most effective way to avoid these problems is to obtain the necessary approvals before starting work and maintain compliance throughout construction.

13. Common Building Construction Compliance Mistakes to Avoid

Even a well-funded building project can experience legal and technical problems when the owner fails to follow the required procedures.

Here are common mistakes to avoid:

1. Starting Construction Without a Building Permit

Do not begin regulated construction work before receiving the required approval.

2. Building Outside the Approved Plans

Constructing additional rooms, floors or structural elements without the necessary approval can result in non-compliance.

3. Using Unqualified Professionals

Engage appropriately registered and qualified professionals for the services they are authorised to provide.

4. Ignoring Soil and Site Conditions

Failure to assess the ground and drainage conditions can lead to unsuitable foundation decisions and future structural problems.

5. Using Poor-Quality Materials

Always select materials that meet the relevant specifications and are suitable for the intended application.

6. Avoiding Construction Inspections

Inspections are part of the building control process. Follow the requirements and instructions provided by the relevant authority.

7. Ignoring Fire Safety and Accessibility

These requirements should be considered during design, not added as an afterthought.

8. Making Structural Changes Without Approval

Do not remove columns, alter beams or add floors without proper engineering assessment and any necessary approval.

9. Allowing the Building Permit to Expire

Monitor the permit’s validity and apply for extensions within the required period.

10. Occupying the Building Without the Required Approval

Apply for an occupation permit and complete the required process before using the building.

14. How Daltrev Co. Ltd Supports Building and Construction Projects in Uganda

Complying with building regulations requires proper planning, technical coordination, cost management and attention to construction quality.

Daltrev Co. Ltd provides construction-related services that can support property owners, developers and organisations undertaking building and infrastructure projects in Uganda.

Its listed services include construction works, construction consultancy, project management, civil works and related building services.

Construction Consultancy

Construction consultancy can help property owners understand important project requirements before and during construction.

Depending on the project scope, Daltrev’s consultancy services include:

  • Project planning and development.
  • Preliminary cost estimates and budgeting.
  • Material cost assessments.
  • Technical advice and assessment.
  • Construction method reviews.
  • Material selection guidance.
  • Site and project assessments.
  • Technical coordination.

Learn more about Daltrev construction consultancy services.

Construction Project Management

Good project management helps coordinate construction activities, resources, contractors and project schedules.

Daltrev lists services covering:

  • Project planning and scheduling.
  • Construction activity coordination.
  • Resource planning.
  • Cost and resource management.
  • Contractor coordination.
  • Progress monitoring.
  • Project reporting.
  • Quality monitoring and inspections.

Explore construction project management services.

Building and Civil Construction Works

Daltrev also lists construction and civil works, including building-related activities, road works, drainage, infrastructure development and other construction services.

The suitability of the company’s services should be confirmed against the specific project requirements, location and scope.

Visit Daltrev construction and civil works to learn more.

For project enquiries, contact Daltrev Co. Ltd through its official contact page.

15. Building Construction Regulations in Uganda: Checklist Before You Start

Use this checklist to organise the important compliance steps for your building project.

  • Verify land ownership and property boundaries.
  • Confirm that the proposed development is permitted on the site.
  • Identify the responsible Building Committee.
  • Conduct the required site assessment.
  • Engage qualified and registered professionals.
  • Prepare architectural drawings.
  • Prepare structural drawings and calculations where required.
  • Obtain the required planning and building approvals.
  • Pay applicable fees.
  • Receive a valid building permit.
  • Understand the conditions attached to the permit.
  • Construct according to approved plans and applicable standards.
  • Arrange required inspections.
  • Obtain approval for changes where necessary.
  • Monitor permit validity and extension requirements.
  • Apply for an occupation permit after completion.

Completing these steps helps reduce avoidable compliance problems and supports a safer, better-managed construction project.

Frequently Asked Questions About Building Construction Regulations in Uganda

1. Is a building permit compulsory in Uganda?

A valid building permit is required before carrying out regulated building operations under the Building Control Act. The exact requirements depend on the nature of the proposed work, so property owners should confirm whether their project qualifies for any applicable exemption.

2. Which law regulates building construction in Uganda?

The main legal framework is the Building Control Act, Cap. 136, as amended by the Building Control (Amendment) Act, 2026. The Building Control Regulations, 2020, National Building Code, 2019 and relevant physical planning laws also apply.

3. What is the role of the National Building Review Board?

The National Building Review Board oversees and supports the implementation of building control requirements in Uganda. Its functions include promoting compliance, guiding Building Committees and exercising enforcement powers provided by law.

4. Who approves building plans in Uganda?

Building plan applications are handled by the relevant Building Committee or urban authority. In Kampala, KCCA is responsible for the applicable development permission and building plan approval process.

5. What documents are needed for building plan approval?

Common documents include proof of land ownership, architectural drawings, structural drawings where required, survey information, application forms and professional registration details. Additional documents depend on the building and the authority handling the application.

6. Can I build a house without an architect in Uganda?

Building design and professional requirements depend on the type and classification of the project. Where an architect is required, the owner should engage a suitably registered professional. Confirm the applicable requirements with the Building Committee.

7. Can I change my building plan after approval?

Changes may be possible, but revisions that affect the approved design or structural arrangements may require revised drawings and approval. Consult the relevant professionals and Building Committee before carrying out the changes.

8. How long does a building permit remain valid in Uganda?

The general statutory framework provides for construction to commence within 12 months and completion within 60 months from commencement, subject to applicable conditions and extensions. Check the actual permit and current legal requirements.

9. Is an occupation permit necessary after construction?

Yes. The Building Control Act provides for owners to notify the Building Committee of practical completion and apply for an occupation permit before occupying or using the building, except where the law provides otherwise.

10. What happens if I build without an approved building plan?

Building without the required permit can result in enforcement action and penalties. Under the 2026 amendment, penalties for certain offences have increased significantly and may include fines calculated according to the built-up area or imprisonment, or both.

11. Are building regulations the same in Kampala and other districts?

The national building control framework applies across Uganda, but the responsible authority, planning requirements, application procedures and local development conditions can differ. Always consult the authority responsible for the property’s location.

12. Does a building permit guarantee that the building is safe?

A permit confirms approval of the proposed development subject to its conditions. Safety also depends on proper construction, suitable materials, professional supervision, inspections and compliance with the approved plans throughout the project.

13. Can I occupy a partially completed building?

The law provides for a limited occupation permit for certain partially completed buildings where the Building Committee determines that the building is safe and adequate for human habitation. Approval is not automatic, and the owner should apply through the relevant authority.

Conclusion: Follow Uganda’s Building Regulations Before Starting Construction

Understanding and complying with building construction regulations in Uganda is essential for anyone planning to develop residential, commercial, industrial or institutional property.

From verifying land ownership and engaging qualified professionals to obtaining building permits, following approved drawings and securing an occupation permit, every stage of a project requires careful attention.

The Building Control (Amendment) Act, 2026 reinforces the importance of legal compliance, construction safety and accountability. Property owners should therefore confirm current requirements with the relevant Building Committee before beginning construction.

If you are planning a building or civil construction project, Daltrev Co. Ltd can be contacted to discuss its construction consultancy, project management and construction services.

Contact Daltrev Co. Ltd today to discuss your building and construction project in Uganda.

Website: https://www.daltrevco.com/

Email: daltrevco@gmail.com

Telephone: +256 744 702 773

Build with proper planning, professional guidance and compliance with Uganda’s building regulations.

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top